Just Enter Your Contact Number For Call Back, 24*7
Dholera SIR Enquiry




Gujarat: Tata Power commissions 300 MW solar plant at Dholera

News Date 2022-08-05

Gujarat: Tata Power commissions 300 MW solar plant at Dholera

AHMEDABAD: Tata Power Renewables Energy Ltd (TPREL), subsidiary of Tata Power, commissioned a 300 MW project in Dholera on Monday.The project will generate 774 million units per annum and in turn, reduce carbon emission by 7.04 lakh MT per year, the company said.Tata Power managed customized installation, based on the geographical locations and land conditions. The total area used for the installation is 1,320 acre divided into six different plots of 220 acres each.



Praveer Sinha, CEO and MD, Tata Power, said “Our technical expertise and project execution skills will further solidify our position in the solar EPC space and help India lead the way in renewable energy growth.”



With the addition of 300 MW, the renewables capacity in operation for Tata Power will now be 3,400 MW of solar and 932 MW of wind. Tata Power’s otal renewable capacity is 5,020 MW including 1,620 MW of renewable projects under various stages of implementation.


New Launch Project